{"id":5035,"date":"2023-06-19T03:49:00","date_gmt":"2023-06-19T03:49:00","guid":{"rendered":"https:\/\/www.asadkarim.co.uk\/?p=5035"},"modified":"2023-06-08T08:07:51","modified_gmt":"2023-06-08T08:07:51","slug":"john-laing-environmental-assets-group-ltd-battery-asset-electricity-storage","status":"publish","type":"post","link":"https:\/\/www.asadkarim.co.uk\/?p=5035","title":{"rendered":"John Laing Environmental Assets Group Ltd: Battery Asset Electricity Storage"},"content":{"rendered":"\n<p>The John Laing Environmental Assets Group has commenced with its first electricity storage solution.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-wp-embed is-provider-jlen-jlen-environmental-assets-group wp-block-embed-jlen-jlen-environmental-assets-group\"><div class=\"wp-block-embed__wrapper\">\n<blockquote class=\"wp-embedded-content\" data-secret=\"qENa1HVGY1\"><a href=\"https:\/\/jlen.com\/\">Home<\/a><\/blockquote><iframe loading=\"lazy\" class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"&#8220;Home&#8221; &#8212; JLEN - JLEN Environmental Assets Group\" src=\"https:\/\/jlen.com\/embed\/#?secret=Krd0P4ZWM9#?secret=qENa1HVGY1\" data-secret=\"qENa1HVGY1\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe>\n<\/div><\/figure>\n\n\n\n<p>JLEN is an environmental infrastructure investment fund which aims to provide shareholders with a sustainable, progressive dividend, paid quarterly and to preserve the capital value of its portfolio on a real basis over the long term through the reinvestment of cash flows not required for the payment of dividends.<\/p>\n\n\n\n<p>the listed environmental infrastructure fund, is pleased to announce the successful launch of its first grid-scale battery project, with the West Gourdie 50MW lithium-ion plant having started commercial operations.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.londonstockexchange.com\/news-article\/JLEN\/first-battery-energy-storage-investment-now-online\/15980163\">https:\/\/www.londonstockexchange.com\/news-article\/JLEN\/first-battery-energy-storage-investment-now-online\/15980163<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.asadkarim.co.uk\/wp-content\/uploads\/2023\/06\/JLEN3.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.asadkarim.co.uk\/wp-content\/uploads\/2023\/06\/JLEN3-1024x576.png\" alt=\"\" class=\"wp-image-5036\" srcset=\"https:\/\/www.asadkarim.co.uk\/wp-content\/uploads\/2023\/06\/JLEN3-1024x576.png 1024w, https:\/\/www.asadkarim.co.uk\/wp-content\/uploads\/2023\/06\/JLEN3-300x169.png 300w, https:\/\/www.asadkarim.co.uk\/wp-content\/uploads\/2023\/06\/JLEN3-768x432.png 768w, https:\/\/www.asadkarim.co.uk\/wp-content\/uploads\/2023\/06\/JLEN3-624x351.png 624w, https:\/\/www.asadkarim.co.uk\/wp-content\/uploads\/2023\/06\/JLEN3.png 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The John Laing Environmental Assets Group has commenced with its first electricity storage solution. JLEN is an environmental infrastructure investment fund which aims to provide shareholders with a sustainable, progressive dividend, paid quarterly and to preserve the capital value of its portfolio on a real basis over the long term through the reinvestment of cash [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-5035","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.asadkarim.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/5035","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.asadkarim.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.asadkarim.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.asadkarim.co.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.asadkarim.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5035"}],"version-history":[{"count":1,"href":"https:\/\/www.asadkarim.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/5035\/revisions"}],"predecessor-version":[{"id":5037,"href":"https:\/\/www.asadkarim.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/5035\/revisions\/5037"}],"wp:attachment":[{"href":"https:\/\/www.asadkarim.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5035"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.asadkarim.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5035"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.asadkarim.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5035"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}